From tenancy selection to occupation certificate — the sequence that keeps approvals, trades and your opening date from colliding.
Every fit-out that blows its programme does so for one of three reasons: the use wasn’t approved, a service didn’t exist, or a variation wasn’t documented. All three are solved before site start.
Check permitted use, landlord fit-out guide, services capacity (power, water, grease line), floor loading and make-good obligations. A cheap tenancy with no grease riser is not cheap.
Bring the shopfitter or designer in early. Layout, joinery, services and compliance should be resolved together — not value-engineered after approval.
Certifier or building surveyor reviews the design and lists what’s triggered. Lodge development consent first if the use changes.
Three itemised quotes, scope exclusions in writing, programme with liquidated damages, and the licence number on the contract.
Building approval, plumbing permit and trade waste consent in hand. Demolition and make-safe first, then services rough-in.
Services and framing, then joinery install, then finishes. Every variation goes back through the certifier.
Final building inspection, fire services certification, food/liquor inspection, then the punch list.
Certificate in hand, fire safety schedule filed, warranty documents and as-built drawings delivered.
Get a benchmark range for your size, sector and state before you sign the lease.